Pipeline forecasting
Will we hit the number?
Quota Lens runs thousands of Monte Carlo simulations of your open pipeline to turn a list of deals into a probability of hitting quota — and shows which deals actually move it.
Try it: drag the Commit win rate down to 60% and watch the odds of hitting quota fall — then sort the table by swing.
| Deal | Stage | Amount | Win prob. | Expected | Swing |
|---|
1 · Score every deal
Each open deal starts with its stage’s historical win rate. Deals that have sat in a stage for more than 45 days get a haircut, because stalled deals close less often.
2 · Account for timing
Winning isn’t enough — the deal has to land this quarter. Each deal carries a slip risk that is highest in early stages and smallest at Commit.
3 · Simulate the quarter
For each simulated quarter, every deal is randomly won or lost using its probability. Adding the wins to closed-won gives one possible outcome; repeating thousands of times gives the full distribution.
4 · Find the swing deals
Comparing quarters where a deal was won with quarters where it wasn’t shows how much each deal changes the odds — so a team knows where to spend executive time.
CSV columns: deal_id, deal, account, owner, stage, amount, close_date, days_in_stage.
Stages: Discover, Qualify, Propose, Negotiate, Commit. Sample data is synthetic and for demonstration only.