Business case builder
Make the case in numbers.
Value Case turns a few operational inputs into the business case a CFO expects — net present value, IRR, payback, best and worst cases, and what the result is most sensitive to.
Try it: switch presets, then drag Share of volume automated and watch payback and the tornado chart respond.
Automation business case · prepared with Value Case
Conservative: 20% less automated, 50% slower ramp, 15% cost overrun. Aggressive: 10% more automated, 25% faster ramp.
Benefits. Labor savings = volume × share automated × (1 − residual human time) × minutes ÷ 60 × loaded rate. Error savings = automated volume × error rate × reduction × cost per error. Benefits ramp linearly to full run-rate.
Costs. One-time cost lands at go-live (month 0). Run cost is spread evenly by month.
Returns. NPV discounts monthly cash flows at the annual rate converted to monthly. IRR is solved numerically and annualized. Payback is the month cumulative cash turns positive.
Capacity. Hours freed ÷ 1,800 productive hours per FTE-year. Freed capacity is usually redeployed rather than cut — the summary says so.